An SBA loan on commercial real estate comes with an environmental review. The rules are in one SBA document, and they are specific. This guide explains the steps, when a Phase I ESA is the starting point, and who can do the work.
This guide is general information. It is not legal or lending advice. Your SBA lender decides what your loan needs.
The short version
SBA requires an environmental investigation of all commercial property that is offered as security for a loan or debenture. The depth of the investigation changes with the risk. A property with a sensitive use starts at a Phase I. A lower risk property can start with a questionnaire. Each step can send the lender to the next step.
Where the rules are
The rules are in SBA Standard Operating Procedure (SOP) 50 10, Lender and Development Company Loan Programs. SBA lists version 8.1 with Technical Updates as the current version. It is effective October 1, 2026.
The environmental policy is in Section A, Chapter 5, Paragraph E. Appendix 4 gives the definitions. Appendix 6 lists the environmentally sensitive industries. Appendix 7 gives the rules for gas station loans.
The SOP says the policy applies to all SBA lenders on all 7(a) and 504 loans. For 7(a) loans, it says that failure to comply may result in a denial of the SBA guaranty.
The steps of an environmental investigation
The SOP names five tools. Each one goes deeper than the one before it.
| Step | What it is | Who does it |
|---|---|---|
| Environmental Questionnaire | A set of questions on past and present uses, hazardous substances, and signs of contamination | The lender completes or reviews it after a site visit. The current owner or operator must sign it. |
| Records Search with Risk Assessment | A search of government databases and historical sources, with a risk rating of low, elevated, or high | An Environmental Professional gives the risk rating |
| Transaction Screen | A limited review under ASTM E1528-22, with an interview, a site visit, and a records review | An Environmental Professional supervises the site visit and gives the conclusion |
| Phase I ESA | A full review under ASTM E1527-21 that meets the federal all appropriate inquiries rule | An Environmental Professional |
| Phase II ESA | Sampling under ASTM E1903-19 (2020) to find the presence, nature, and extent of a release | An Environmental Professional |
Step one is the NAICS code
The lender must first make a good faith effort to find the NAICS codes for the current use and the known prior uses of the property. The lender then compares those codes to the list in Appendix 6.
The one exception is a unit in a Multi-Unit Building. The SOP defines that as a non-industrial building with four or more units. For such a unit, the lender can go to the loan amount test below.
If there is no match
The loan amount sets the starting point.
| Loan amount | Minimum starting point |
|---|---|
| Up to and including $250,000 | Environmental Questionnaire |
| More than $250,000 | Environmental Questionnaire and Records Search with Risk Assessment |
The results then decide the next step:
- If the questionnaire shows that more investigation is needed, the lender must get a Records Search with Risk Assessment at a minimum.
- If the records search rates the property as anything other than low risk, the lender must get a Phase I ESA.
- If a Transaction Screen shows that more investigation is needed, the lender must get a Phase I ESA.
- If the owner or operator will not sign the questionnaire, the lender cannot use it. The lender must then get a Transaction Screen at a minimum.
When a Phase I ESA is the starting point
The SOP is direct on this point. If a NAICS code matches an environmentally sensitive industry in Appendix 6, the investigation must begin with a Phase I. The loan amount does not matter.
Appendix 6 is a long list. Some entries have conditions. These are examples:
| NAICS code | Industry in Appendix 6 | Condition in the list |
|---|---|---|
| 457 | Gasoline stations and fuel vendors | Not required for propane or firewood dealers |
| 8111 | Automotive repair and maintenance | A Transaction Screen is an acceptable start for car wash only sites |
| 8123 | Laundry and dry cleaning services | If dry cleaning operations have ever existed on site |
| 441 | Motor vehicle and parts dealers | If service bays are present |
| 323 | Printing and related support activities | None |
| 332 | Fabricated metal product manufacturing | Not required if assembly only |
A note under the list adds one more rule. A Phase I should always be obtained if the business sells, supplies, or dispenses fuel, even if its NAICS code is not on the list.
For more on the Phase I itself, see our Phase I Environmental Site Assessment service.
Gas stations
If the NAICS code begins with 457, the investigation must begin with a Phase I. The lender must also follow Appendix 7. Appendix 7 says the investigation for a gas station loan must:
- Begin with a Phase I ESA by an independent Environmental Professional.
- Include an analysis of all relevant environmental records for the property and the adjoining properties.
- Include a determination of whether the station complies with the tank and equipment testing rules that apply.
- Include the results of any further investigation that the Environmental Professional recommends.
The SOP says the loan may not be disbursed until full compliance is achieved. Leaking or defective equipment must be replaced or repaired before disbursement. A Phase II for a gas station loan must be done by an independent Environmental Professional who holds a current Professional Engineer or Professional Geologist license and has 3 years of relevant experience.
See our page on gas station due diligence for the usual concerns at these sites.
Dry cleaners
Dry cleaners have the strictest rule. For a property with on-site dry cleaning that uses, used, or likely used chlorinated or petroleum-based solvents, the SOP requires a Phase I followed by a Phase II. The rule covers current dry cleaners and historical ones.
The investigation must address soil, groundwater, and soil vapor. The Phase II has the same license and experience rule as a gas station Phase II. A lender that wants to deviate must ask SBA for an exception to policy.
Soil vapor is part of the rule for a reason. Read vapor intrusion in Washington and our page on dry cleaners and laundromats.
Who can do the work
Transaction Screens, Phase I ESAs, and Phase II ESAs must be performed by an Environmental Professional. The SOP uses the definition in 40 CFR 312.10(b). SBA adds two conditions. The Environmental Professional must be impartial. The Environmental Professional must also carry errors and omissions insurance of at least $1,000,000 per claim or occurrence.
The Reliance Letter
Each Transaction Screen, Phase I, and Phase II must come with the SBA Reliance Letter in Appendix 5. This is true even when the report is addressed to the lender. The SOP says the wording of the letter may not be changed. A Records Search with Risk Assessment does not need the letter.
Ask your consultant about the Reliance Letter before you order the work. Our lender checklist can help you collect the right items.
Report dates
The SOP says Environmental Investigation Reports must be dated within one year of the date SBA issues the loan number.
For a Phase I, the SOP notes the EPA rule on updates after 180 days. SBA will still accept an AAI compliant Phase I dated within one year of the loan number. The SOP also says that parties may wish to meet the EPA time limits to protect their legal defenses. Read how long a Phase I ESA is valid for the EPA dates.
What happens after the Phase I
The SOP requires each Phase I to end with a clear conclusion. Either the risk is so small that no more investigation is warranted, or the risk is enough to warrant more investigation.
If the Phase I recommends more work, that work is typically a Phase II. A lender that still wants to make the loan must follow the recommendation or ask SBA for an exception to policy. See Phase I vs Phase II ESA for the difference.
If the Phase II finds contamination
The lender must make sure the Environmental Professional has documented four items:
- Whether the contamination exceeds the reportable or actionable levels.
- Whether remediation is necessary.
- An estimate of the remediation costs.
- The projected completion date of the remediation.
The SOP says loans may not be approved or disbursed with known contamination or on-going remediation, unless the risks are minimized to the satisfaction of SBA. It lists factors that SBA can rely on. One is a no further action letter or closure letter from a government agency. Another is an escrow account equal to at least 150 percent of the estimated remediation cost.
For how those letters work, read our guides to the Washington Voluntary Cleanup Program and Oregon DEQ cleanup options.
Next step
Tell your consultant at the start that the loan is an SBA loan. The report and the Reliance Letter must match the SOP. Kee Enviro works on commercial property in Washington and Oregon. See how we work with lenders, or contact us to talk through your property.