Answer 4 questions about the building. See if it has common seismic risk flags, and if a lender may ask for a seismic review or a PML estimate.
What lenders look for
This check gives points for the structure type, the age, and the height, and takes points away for a retrofit. More points mean more common risk flags. It is a screen, not an engineering opinion. A seismic evaluation looks at the drawings, the lateral system, and the site soils.
The Puget Sound area has a real earthquake risk. Some commercial lenders ask for a seismic review or a probable maximum loss (PML) estimate, often for older buildings. Each lender sets its own rules.
What is an unreinforced masonry (URM) building?
A brick or stone building with no reinforcing steel in the walls. These buildings can be badly damaged in an earthquake. Seattle keeps a database of URM buildings. Retrofit is voluntary now. The City states that it plans to make retrofit mandatory in the future.
Which building types does this check flag?
Unreinforced masonry, older concrete buildings, soft-story wood buildings with parking or shops on the ground floor, and older tilt-up buildings. Age, height, and a past retrofit also change the result.
Is this a seismic evaluation?
No. It is a quick screen with a simple point score. A seismic evaluation by an engineer looks at the drawings and the building.