Who remediation is for
Remediation is for owners, buyers, and developers who have confirmed contamination and need to clean it up. Common clients include:
- Owners of former gas stations, dry cleaners, and industrial sites
- Buyers who need cleanup done before or after closing
- Developers who want to rebuild on a former commercial or industrial site
- Owners who want a No Further Action opinion before they sell or refinance
What you get
A corrective action plan
We start with the data. Then we write a corrective action plan that sets cleanup goals, methods, cost, and schedule.
Cleanup methods
We match the method to the site. Our options include:
| Method | What it does |
|---|---|
| Soil excavation and disposal | Removes contaminated soil and sends it to an approved facility |
| Groundwater pump and treat | Pumps groundwater out, treats it, and discharges or reuses it |
| Air sparging | Pumps air into groundwater so volatile chemicals evaporate and can be pulled out, often with soil vapor extraction |
| Soil vapor extraction | Pulls vapors out of the soil above the water table with a vacuum system |
| Best available technologies | Other proven methods that fit the site and the budget |
System design and field work
Our engineers design cleanup systems in-house. We coordinate the field work with heavy equipment contractors we trust. We also do project and construction management, so one team runs the job.
Agency negotiation
We work with the Washington Department of Ecology and local agencies. We negotiate cleanup levels and scope that protect people and the environment and fit the site.
Washington rules that apply
MTCA
The Model Toxics Control Act (MTCA) is Washington’s cleanup law. Liability under MTCA is strict, joint and several. This means a current owner can be liable for contamination it did not cause, and one party can be liable for the full cost.
Voluntary Cleanup Program
The Department of Ecology runs the Voluntary Cleanup Program (VCP). Under the VCP, an owner does an independent cleanup and asks Ecology for written opinions. When the site meets all MTCA cleanup requirements, Ecology can issue a No Further Action (NFA) opinion. Ecology says its NFA opinions normally give lenders and other agencies the information they need. Ecology lists what to prepare before you apply on its VCP page. Petroleum released from a petroleum storage tank system does not qualify for the VCP; PLIA’s Technical Assistance Program reviews those cleanups.
Oregon cleanups
In Oregon, cleanups follow DEQ’s rules in OAR 340-122. DEQ offers an Independent Cleanup Pathway for low and medium priority sites, without ongoing DEQ oversight, and a Voluntary Cleanup Pathway with DEQ oversight for sites of any priority. Both can end with a No Further Action determination. See our Oregon page.
Why Kee
- Engineers on staff. We design systems in-house, not through a third party.
- Broad science team. Our staff have backgrounds in engineering, geology, hydrogeology, chemistry, environmental science, and construction.
- Field experience. We coordinate heavy equipment contractors and manage the site.
- Agency experience. We help clients through Ecology’s Voluntary Cleanup Program toward a No Further Action opinion.
- Results you can show a lender. We aim for a clear closure document.
Next step
If you do not have data yet, start with a Phase II ESA or call 206-914-4989.

