ASTM E1527-21 vs E1527-13: What Changed for Phase I ESAs

Updated November 27, 2026

Short answer

ASTM E1527-21 replaced E1527-13 as the Phase I ESA standard that EPA recognizes for all appropriate inquiries. EPA published its final rule on December 15, 2022. The rule took effect on February 13, 2023. EPA stopped recognizing E1527-13 after February 13, 2024. The main changes are a revised REC definition, more historical research on adjoining properties, clearer report dates, and new text on emerging contaminants such as PFAS.

Environmental professional inspecting an old brick warehouse for a Phase I report

The Phase I ESA standard changed in 2021. The older edition, ASTM E1527-13, is no longer recognized by EPA. If you have an old report, or a lender policy that names the old edition, you need to know what changed. This guide gives the dates and the main differences. It is general information, not legal advice.

The short version

ASTM E1527-21 is the current Phase I standard. EPA recognizes it for the federal all appropriate inquiries (AAI) rule. EPA stopped recognizing E1527-13 after February 13, 2024. The newer edition asks for more historical research, clearer findings, and clearer dates in the report.

The EPA rule and the key dates

Timeline: ASTM published E1527-21 in November 2021. EPA published its rule on December 15, 2022. The rule took effect on February 13, 2023. E1527-13 was no longer recognized after February 13, 2024.

EPA’s AAI rule is 40 CFR Part 312. Section 312.11 lists the ASTM standards that a party may use to meet the rule.

Date Event
November 2021 ASTM published E1527-21
March 14, 2022 EPA published a direct final rule that kept both editions
May 2, 2022 EPA withdrew that rule after adverse comments
December 15, 2022 EPA published the final rule that references E1527-21
February 13, 2023 The final rule took effect
February 13, 2024 Last day that EPA recognized E1527-13

Why EPA dropped the 2013 edition

Commenters told EPA that two recognized editions would confuse the market. EPA agreed to remove its reference to E1527-13 after a sunset period. EPA said that the period gave parties time to finish assessments in progress and to learn the new standard.

Is the ASTM standard required?

No. EPA states that the use of E1527-21 is not required. A party may follow the rule text in 40 CFR Part 312. EPA also states that the rule and E1527-21 have no legally significant differences. In practice, most Phase I reports follow the ASTM standard.

Main changes at a glance

Topic E1527-13 E1527-21
REC definition “Likely” applied across all three parts Three clearer parts. “Likely” applies to the second part only
Historical research The professional chose the sources Four named sources for the property, and for adjoining properties when the sources cover them
Significant data gap Not defined Defined as a gap that affects the ability to identify a REC
Report dates Less specific The report must show the date of each time-limited part
Site plan and photos Not stated as required Required in the report
Emerging contaminants Not named Named as a non-scope consideration
Lien and title search Less detail More detail on methods. A title search report must go back to 1980

The REC definition

The recognized environmental condition (REC) is the main finding of a Phase I. The 2021 definition has three parts: a known release, a likely release, and a material threat of a future release.

The old wording used “likely” in a way that touched all three parts. The ASTM committee found that this confused readers. The new wording keeps “likely” in the second part only. A new appendix, X4, gives examples and a decision diagram. A new note explains that “likely” means not certain and not proved, but expected by a reasonable observer who uses logic, experience, and the evidence.

EPA’s comparison document says that the wording of REC, CREC, and HREC changed, but the concepts did not. For the meaning of each term, read what is a REC.

Old closures get a new review

Under E1527-21, a past cleanup is not an HREC by default. The environmental professional must check that the old closure data meet current standards for unrestricted use. If they do not, the finding can be a REC.

Historical research on adjoining properties

This change adds real work to the report. E1527-21 names four standard historical sources:

  • Aerial photographs
  • Fire insurance maps
  • Local street directories
  • Historical topographic maps

The professional must review these sources for the property when they are reasonably ascertainable and likely to be useful. The professional must also review them for adjoining properties when the same sources cover those properties. If the professional skips one of the four for the adjoining properties, the report must say why.

More detail on past uses

A general label such as “retail” is not always enough. A former dry cleaner in a retail center is one example. If the general use is retail, industrial, or manufacturing, the professional must review more sources when they are likely to show a more specific use.

Report dates and shelf life

The time limits did not change. The federal rule still sets a one-year limit and a 180-day limit. Both count back from the date you buy.

E1527-21 made the wording clearer in three ways.

  1. The report must identify the date of each time-limited part. These parts are the interviews, the government records review, the site visit, and the professional’s declaration.
  2. The lien search is a user duty. If the consultant does the search, the report shows that date too.
  3. The report date is not the date to count from. Count from the date of the earliest time-limited part.

For examples, see how long a Phase I ESA is valid. You can also run your dates in the Phase I validity check.

Emerging contaminants and PFAS

E1527-21 added text on emerging contaminants. PFAS is the common example. The standard treats a substance as non-scope when federal Superfund law (CERCLA) does not define it as a hazardous substance. You can still ask the consultant to add such a substance to the scope.

EPA’s comparison document adds a key point. When CERCLA defines a contaminant as a hazardous substance, a Phase I under E1527-21 must evaluate it.

That point now matters for two PFAS. EPA designated PFOA and PFOS as CERCLA hazardous substances. The rule was published on May 8, 2024, and took effect on July 8, 2024. In September 2025, EPA said that it is keeping the designation. Other PFAS can still be non-scope under the standard. Some states regulate them under state law.

Ask your consultant how the report covers PFAS.

Other changes in the report

  • Site plan and photos. The report must include photographs and a map that shows the property boundaries.
  • Conclusions. The conclusions list RECs, CRECs, and significant data gaps.
  • Site visit notes. The report states which listed features and conditions were present and which were not.
  • Title search. The user gives the consultant title records that show environmental liens and use limits. A title search report used for this purpose must review land records from 1980 to the present.
  • One term for the site. The standard uses “subject property” throughout.

For the buyer’s duties, see the Phase I ESA checklist.

What this means for your deal

If you have an older report

A Phase I completed while EPA still recognized E1527-13 is now more than one year old. That is past the federal time limit. You need a new report to support a buyer defense. The old report is still useful as background. Give it to your new consultant.

If you are a lender

Check that your policy names ASTM E1527-21. Check that each report states that it conforms to that edition. See our page for lenders.

If you are ordering a new Phase I

Ask the consultant to confirm the edition in the proposal. Talk about non-scope items, such as PFAS, before the work starts. Many Phase I reports take two to three weeks.

Next step

Check an existing report’s dates with the Phase I validity check. To order a report under the current standard, see our Phase I Environmental Site Assessment service or contact Kee Enviro.

Frequently asked questions

Is ASTM E1527-13 still valid for a Phase I ESA?

Not for the federal all appropriate inquiries rule. Under 40 CFR 312.11, EPA recognized E1527-13 only until February 13, 2024. A new Phase I should use ASTM E1527-21.

When did ASTM E1527-21 take effect?

ASTM published the standard in November 2021. EPA published its final rule on December 15, 2022. The rule took effect on February 13, 2023.

Does EPA require the ASTM standard?

No. EPA says that the use of ASTM E1527-21 is not required. A party can follow the rule text in 40 CFR Part 312. Most consultants use the ASTM standard because EPA recognizes it as compliant.

Does ASTM E1527-21 require PFAS testing?

No. A Phase I takes no samples. The 2021 standard treats emerging contaminants that are not CERCLA hazardous substances as non-scope. EPA later designated two PFAS, PFOA and PFOS, as CERCLA hazardous substances, effective July 8, 2024. Ask your consultant how the report covers PFAS.

Did the 180-day and one-year limits change?

The limits did not change. E1527-21 made the wording clearer. The report must show the date of each time-limited part, and the report date is not the date to count from.

Sources

This article is general information, not legal advice. Rules and fees change. Check with the agency or call us.