For developers
Keep the soil from stopping the schedule.
Due diligence before you buy the land, and soil and vapor plans that fit your grading and foundation work.
What developers need from us
Answers during feasibility
A Phase I, and a Phase II if one is needed, before your money is at risk.
A plan for the soil you move
Stockpile samples and a soil plan before soil leaves the site.
Tacoma Smelter Plume sampling
In the plume, arsenic and lead are usually in the top six inches of soil. Ecology guidance sets how many samples to take.
Vapor answers before design
A vapor intrusion assessment tells the design team if the new building needs a vapor barrier or a vent system.
Two paths to your closing date.
A former gas station, from the day you order. One path if the soil is clean. One path if it is not, or if tanks are still in the ground.
Phase I, Phase II, then lender and attorney review.
30-day notice, tanks out, reports. Then cleanup and a PLIA review.
Washington deadlines on Lane 2
- About Week 8Notice of intent to Ecology, when the Phase II report arrivesWAC 173-360A-0810(1)
- 30 days after the noticeEarliest start of tank closureWAC 173-360A-0810(1)
- Within 24 hoursA confirmed release is reportedWAC 173-360A-0750(1)
- 30 days after a release is confirmedSite characterization dueWAC 173-340-450
- 30 days after closureChecklists and report dueWAC 173-360A-0810(2)(c)
- 90 days after a release is confirmedInterim action report dueWAC 173-340-450
- Phase I, about 3 weeks
- Phase II, about 5 weeks
- Review, 1 to 2 weeks, or reports on Lane 2
- Same as Lane 1
- 30-day notice
- Tanks out
How the work goes
Send the parcel and your schedule
We send a written quote and a delivery date.
Phase I, then a focused Phase II
Each boring is placed to answer one finding from the Phase I.
A cleanup plan that fits construction
Where it fits, grading and excavation can be part of the remedy.
Closure reports
Confirmation samples and the report that supports an agency opinion.
Services developers use most
Free tools for developers
Questions developers ask
Can cleanup happen at the same time as construction?
Often, yes. Excavation for a foundation can remove contaminated soil too. The plan and the sampling must be set before the work starts.
Does a site in the Tacoma Smelter Plume need sampling?
Ecology recommends soil sampling where estimated arsenic is above the state cleanup level of 20 ppm. See our page on Tacoma Smelter Plume properties.
How early must we start?
Many Phase I reports take two to three weeks, and a focused Phase II often takes three to six weeks. Start when you open feasibility.