For developers

Keep the soil from stopping the schedule.

Due diligence before you buy the land, and soil and vapor plans that fit your grading and foundation work.

What developers need from us

01

Answers during feasibility

A Phase I, and a Phase II if one is needed, before your money is at risk.

02

A plan for the soil you move

Stockpile samples and a soil plan before soil leaves the site.

03

Tacoma Smelter Plume sampling

In the plume, arsenic and lead are usually in the top six inches of soil. Ecology guidance sets how many samples to take.

04

Vapor answers before design

A vapor intrusion assessment tells the design team if the new building needs a vapor barrier or a vent system.

Two paths to your closing date.

A former gas station, from the day you order. One path if the soil is clean. One path if it is not, or if tanks are still in the ground.

Lane 1. No contamination found
Phase IPhase II
Ready to close about Week 10

Phase I, Phase II, then lender and attorney review.

Lane 2. Contamination found, or tanks still in the ground
Same as Lane 130-day noticeReports due 30 and 90 days after confirmation
Then cleanup and a PLIA review

30-day notice, tanks out, reports. Then cleanup and a PLIA review.

Washington deadlines on Lane 2

  1. About Week 8Notice of intent to Ecology, when the Phase II report arrivesWAC 173-360A-0810(1)
  2. 30 days after the noticeEarliest start of tank closureWAC 173-360A-0810(1)
  3. Within 24 hoursA confirmed release is reportedWAC 173-360A-0750(1)
  4. 30 days after a release is confirmedSite characterization dueWAC 173-340-450
  5. 30 days after closureChecklists and report dueWAC 173-360A-0810(2)(c)
  6. 90 days after a release is confirmedInterim action report dueWAC 173-340-450
  • Phase I, about 3 weeks
  • Phase II, about 5 weeks
  • Review, 1 to 2 weeks, or reports on Lane 2
  • Same as Lane 1
  • 30-day notice
  • Tanks out
Two paths from the day you order, in weeks. Report times are typical only. Rule deadlines are exact. Lane 2 assumes the notice goes to Ecology when the Phase II report arrives, and that a release is confirmed when the tanks come out. We confirm the dates in your quote.

How the work goes

  1. Send the parcel and your schedule

    We send a written quote and a delivery date.

  2. Phase I, then a focused Phase II

    Each boring is placed to answer one finding from the Phase I.

  3. A cleanup plan that fits construction

    Where it fits, grading and excavation can be part of the remedy.

  4. Closure reports

    Confirmation samples and the report that supports an agency opinion.

Services developers use most

Free tools for developers

Questions developers ask

Can cleanup happen at the same time as construction?

Often, yes. Excavation for a foundation can remove contaminated soil too. The plan and the sampling must be set before the work starts.

Does a site in the Tacoma Smelter Plume need sampling?

Ecology recommends soil sampling where estimated arsenic is above the state cleanup level of 20 ppm. See our page on Tacoma Smelter Plume properties.

How early must we start?

Many Phase I reports take two to three weeks, and a focused Phase II often takes three to six weeks. Start when you open feasibility.